Lenel Lnl3300m5 Installation Manual Upd Top Jun 2026
: The LNL-3300-M5 is plug-compatible with the 12 VDC power input, cabinet tamper, and AC power fail inputs from the legacy Power/Comm Board. Reconnect and Power Up
: Power the controller and connect it to the OnGuard system via the on-board Ethernet port. lenel lnl3300m5 installation manual upd top
: Carefully disconnect field wiring from the legacy CPU and Power/Comm boards. : Mount the LNL-3300-M5 : The LNL-3300-M5 is plug-compatible with the 12
: The process begins by powering down the legacy controller and unplugging existing field wiring. Board Replacement : The old CPU and Power/Comm boards are removed. The new LNL-3300-M5 lenel lnl3300m5 installation manual upd top
: Remove the wiring from the legacy CPU and Power/Comm boards.